Customization: | Available |
---|---|
After-sales Service: | 24 Hours Online |
Warranty: | 36 Months |
Still deciding? Get samples of US$ 2500/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model: HE-1123
Vehicles parked per unit | 2 | Power supply | 100-480V. 1/3P. 50/60Hz |
Rated capacity | 2300kg | Finishing | Power coating with Akzo Nobel powder |
Available car length | 5000mm | Pump motor power | 2.2Kw |
Available car width | 1850mm | Pump flow | 2.6ML/r |
Available car height | 2050mm | Pump working pressure | 16-17MPa |
Drive mode | Hydraulic cylinder+chains | Hydraulic cylinder | Italian Aston seals |
Operation | Key switch | Hydraulic oil |
L - HV 46#
|
Lifting speed | <50s | Lifting chain | LH1266 |
Descending speed | >35s | Balance chain | LH1066 |
1. Lifting capacity 2300kg.
2. Car heights on ground up to 2050mm.
3. Platform width up to 2500mm.
4. Lifting height adjustable by limit switch.
5. Electric auto lock release enables easier operation .
6. 24V control voltage avoids electric shock.
7. Galvanized platform, high-heel friendly.
8. Bolts & nuts passing 48hrs Salt Spray Test.
9. Driven by hydraulic cylinder + Korean lifting chain.
10. Synchronization chain keeps platform level under all conditions.
11. Akzo Nobel powder coating provides long lasting superficial protection.
12. Proven high end quality with CE certificate tested by TUV.
Clear platform width of 2100 mm for car widths of 1850 mm. For large touring sedans we recommend a clear platform width of at least 2300-2500 mm.
According to ISO 3864 the floor has to be marked with 100 mm wide yellow-black at a distance of 500 mm from the platform edge by the purchaser (to be performed according to local regulations.)
The lowering speed of an empty platform is considerably lower than a loaded one.
It is not possible to have channels or undercuts and/or concrete haunches along the floor-to-wall joints. It the event that channels or undercuts are necessary, the system width needs to be reduced or the installation width needs to be wider.
The manufacturer reserve the right to construction or model modifications and/or alterations.
Furthermore, the right to any subsequent part modification and/or variations and amendments in procedures and standards due to technical and engineering progresses in the art or due to environmental regulation changes, are also hereby reserved.
Unit A
Total width required | Clear platform width |
2547 | 2100 |
2647 | 2200 |
2747 | 2300 |
2847 | 2400 |
2947 | 2500 |
Total width required | Clear platform width |
4929 | 2100 |
5129 | 2200 |
5329 | 2300 |
5529 | 2400 |
5729 | 2500 |
Total width required | Clear platform width |
7311 | 2100 |
7611 | 2200 |
7911 | 2300 |
8211 | 2400 |
8511 | 2500 |
Scope of application:
Suitable for residential buildings, office buildings and business premises, hotels
Only for long-term users that have been instructed on how to use the system
For frequently changing users (e.g. for office, hotel and business premises or similar)
- only parking on ground level
- performance of technical system adjustments in necessary
- consultation with HIGH ELEPHANT is mandatory
Noise protection:
Insulation figure of the construction of min. Rw = 57 dB
Walls which are bordering the parking systems must be done as single wall and deflection resistant with min. m =300 kg/ m2
Solid ceiling above the parking systems with min. m = 400 kg/ m
At differing constructional conditions additional sound absorbing measures are to be provided by the customer
The best results are reached by separated sole plates from the construction.
Electrical installation preparation:
Cabling preparation to be performed by the customer:
- Up to the main switch to be in place prior to starting the installation operations
- Connection to the main switch during installation
- System functional check testing can be performed by the electrician provided by the customer
Grounding and potential equalization:
- To be performed by the customer compliant to local regulations
- Connections required every 10 meters
Protection against corrosion:
Independent of a maintenance workings has to be carried out according to HIGH ELEPHANT Cleaning and Maintenance Instruction regularly.
Clean up galvanized parts and platforms of dirt and road salt as well as other pollution (corrosion danger)!
Temperature:
The installation is designed to operate between +5°and +40°C. Atmospheric Humidity: 50% at +40°C.If the local circumstances differ from the above please contact HIGH ELEPHANT
Fire safety:
Each and every fire safety requirement and all possible mandatory item(s) and equipment(s) (fire extinguishing systems and fire alarm systems, etc.) are to be provided by the customer.
Parking:
- Drive the car backward onto the appropriate position of the platform. Collision with the control arm and side beams shall be avoided.
- Put the brake on after vehicle parked on the targeted position to avoid any accidental movement
- Open the car door carefully to avoid any collision. Pay attention to the waving plates and side beams in case any falling down of person
- Turning UP to lift the car to the appropriate position, and the platform will be locked automatically.
- Before another vehicle parked under platform, please check and make sure the nether vehicle is lower than platform height, to avoid any damage.
Railings:
If walkways are arranged directly to the side or behind the systems, railings have to be provided acc. EN ISO 13857 by client acc. to local requirements, height min. 200cm.
1. Do lubrication on guide rail and guide pulley once per month.
2. Do lubrication on balance chain once per month.
3. Change all the hydraulic oil three months after first operation;and change oil every nine months after first changing.
4. Frequently check the screw nuts of bolts fixing the electromagnet and locking plate, if any screw nut is loosening please fasten it asap.
5. If any noise comes out from electromagnet, please replace it asap.
6. The seal in hydraulic cylinder should be replaced every two years.
7. The roller and sliding block should be replaced every two years.
8. The valve element in solenoid valve and filter in power unit should be cleaned every half year.
9. Before operation, please check the connector of electromagnet if it's loosening please fasten it; then do testing on top limit switch and photocell sensor, if it cannot work please fix the problem, and if cannot fix it please replace it.
Trade Terms |
FOB / CFR |
MOQ |
3UNITS (USD200.00 extrally charged for LCL shipment to cover the inland freight + custom declaration fee) |
Port |
QINGDAO |
Shipment |
BY SEA /AIR |
Payment Terms |
T/T |
Payment condition |
30% prepayment,balanced before shipment. |
Supply Capability |
1000units/month |
Sample Availability |
Yes ,But all freight(Inland freight +seafreight) covered by buyer |
Sample Time |
5-10days(depends on whether have in stock) |
Lead Time |
25-30days(Rush season 5-10days longer) |
Packing |
Metal frame&Carton |
Delivery time |
30-45days shipping time (depends on destination position) |
Service |
1% free parts;1year warranty after port of destination |