After-sales Service: | 24 Hours Online |
---|---|
Warranty: | 12 Months |
Type: | Hydraulic Jack |
Samples: |
The standard configuration
|
---|
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Rated Load | Min.Height | Max.Height | N.W/G.W | Package Size | QTY/20CY |
3.0T | 116mm | 860mm | 77.5/84.5kg | 1260*700*250mm | 130pcs |
A | 1000mm | F | 1150mm | L | 1280mm |
B | 580mm | G | 120mm | M | 1470mm |
C | 360a265mm | H | 220mm | N | 650mm |
D | 400mm | I | 880mm | O | ±0° |
E | 1260mm | J | 960mm | P | 0° |
|
Lift the car to a certain height with a lift |
Push the Low Transmission Jack under the car, raise the Low Transmission Jack to the proper position, remove the items to be serviced (transmission, engine, Prop-shaft, front and rear axles, etc.) and place them in the center of the bracket. Then secure the item with a steel chain, open the pressure relief valve, and place the bracket and item in the low position |
Push the Low Transmission Jack to the desired position, and use a crane to hoist the object down for maintenance |
After the object is repaired, lift the object with a crane and place it in the center of the bracket, fasten the object with a steel chain, and push the Low Transmission Jack to the proper position. |
Close the pressure relief valve, step on the oil pump, lift the object to a suitable position, and install the object. If the object position is not correct, you can move the Low Transmission Jack or the adjustment hand wheel under the bracket to adjust |
Matters needing attention |
Overload use is strictly prohibited |
Items should be fastened with steel chains before moving |
If the object needs to be moved on this Low Transmission Jack, the bracket should be placed at the lowest position |
The ground should be firm and flat, and no unevenness and obstacles are allowed to avoid damage to the wheels and the overturning of the whole machine
|
Trade Terms |
FOB / CFR |
MOQ |
3UNITS (USD200.00 extrally charged for LCL shipment to cover the inland freight + custom declaration fee) |
Port |
QINGDAO |
Shipment |
BY SEA /AIR |
Payment Terms |
T/T |
Payment condition |
30% prepayment,balanced before shipment. |
Supply Capability |
1000units/month |
Sample Availability |
Yes ,But all freight(Inland freight +seafreight) covered by buyer |
Sample Time |
5-10days(depends on whether have in stock) |
Lead Time |
25-30days(Rush season 5-10days longer) |
Packing |
Metal frame&Carton |
Delivery time |
30-45days shipping time (depends on destination position) |
Service |
1% free parts;1year warranty after port of destination |
Suppliers with verified business licenses